RESULTS
Time Savings 2.25 hours/unit
Using MR and the HoloLens 2 to guide stenciling, the production line was able to save 2.25 hours per unit. When a rush order had to fulfilled within a few days time, the company was able to save over 200 hours of time in getting the shipment out the door.
View and download this case study here

